Left Hip Hemiarthroplasty for Femoral Neck Fracture
Tags: Orthopaedics
Table of Contents
- 1. Introduction
- 2. Slightly Curvilinear Incision Centered Over the Greater Trochanter
- 3. Dissection Through the Soft Tissues and Exposure of the IT Band
- 4. Longitudinal Incision Through the IT Band and Retraction to Expose the Greater Trochanter
- 5. Anterolateral Approach to Expose the Hip Capsule by Peeling Off the Confluent Layer of Abductors and Vastus Lateralis at its Insertion onto the Greater Trochanter
- 6. T-Shaped Capsulotomy and Exposure of the Femoral Neck Fracture
- 7. Femoral Head Removal and Washing Away any Bone Fragments
- 8. Femoral Head Measurements and Trialing Femoral Head Implant
- 9. Getting Lateral on the Canal with a Box Cutter While Protecting the Insertion of the Abductors
- 10. Using Canal Finder and Reamers to Appropriately Size the Canal
- 11. Femoral Broaching to Appropriately Size the Canal
- 12. Trial for New Femoral Neck and Head
- 13. Cement Mixing and Femoral Canal Irrigation and Hemostasis
- 14. Cement Placement with Cement Restrictor at the Bottom
- 15. Femoral Stem Insertion Making Sure of Appropriate Version and Valgus Position
- 16. Attachment of New Femoral Head and Reduction of the Hip
- 17. Closure
- 18. Post-op Remarks
1. Introduction
2. Slightly Curvilinear Incision Centered Over the Greater Trochanter
3. Dissection Through the Soft Tissues and Exposure of the IT Band
4. Longitudinal Incision Through the IT Band and Retraction to Expose the Greater Trochanter
5. Anterolateral Approach to Expose the Hip Capsule by Peeling Off the Confluent Layer of Abductors and Vastus Lateralis at its Insertion onto the Greater Trochanter
6. T-Shaped Capsulotomy and Exposure of the Femoral Neck Fracture
- Tag the Two Corners of the Capsulotomy Leaflets
7. Femoral Head Removal and Washing Away any Bone Fragments
8. Femoral Head Measurements and Trialing Femoral Head Implant
9. Getting Lateral on the Canal with a Box Cutter While Protecting the Insertion of the Abductors
10. Using Canal Finder and Reamers to Appropriately Size the Canal
11. Femoral Broaching to Appropriately Size the Canal
12. Trial for New Femoral Neck and Head
- Reduction of Trial Components and Confirmation of Appropriate Sizing
- Verify with Flat Plate X-Ray
13. Cement Mixing and Femoral Canal Irrigation and Hemostasis
14. Cement Placement with Cement Restrictor at the Bottom
15. Femoral Stem Insertion Making Sure of Appropriate Version and Valgus Position
16. Attachment of New Femoral Head and Reduction of the Hip
17. Closure
- Capsule by Tying Together the Two Tagging Sutures
- Abductors and Vastus Lateralis to the Greater Trochanter with Horizontal Mattress Sutures with #5 Ethibond
- Final Confirmation with Flat Plate X-Ray
- IT Band with #1 Vicryl
- Skin and Soft Tissues